3S Green Construction Project

Optimizing the electricity usage environment can reduce unnecessary power consumption and create an economical and safe power environment.

What is the 3S Green Construction Project?

The project involves visiting and inspecting factory power facilities to check whether costs are being paid for surplus electricity. By changing industrial high voltage to low voltage through facility construction, it is possible to reduce electricity bills (25-39%) and significantly lower maintenance costs according to KEPCO’s regulations.

Example of the 3S Green Construction Project

Example of Pre-Review for Low Voltage Application

Example of Cost Savings

Process of the 3S Green Construction Project